During this phase the water pump is subjected to a series of performance and endurance bench tests to optimise pump motor operation, heating & cooling operations, pressure control valve operation and set vacuum controls.
This exhaustive endurance testing spans a six-week period and validates the design and quality of the water pump before it enters production.